HIGHCLIFF METALS CORP. (IMAHF) 股票表現
查看HIGHCLIFF METALS CORP.的財務表現,包括市值、價格變動百分比、本益比,以及歷史和當前股價。
前收盤價0.40
52週高點0.40
打開0.40
52週低點0.06
資金流向0.00%
本益比0%
T/O0.00b
市淨率18.24%
離職率0.00%
市值0.06b
股息0
總股數0.17b
股息殖利率0%
批量大小1
HIGHCLIFF METALS CORP.公司簡介
I-Minerals is developing the the Bovill Kaolin deposit, a source of high purity potassium feldspar, quartz, kaolin and halloysite. The deposit represents one of the largest undeveloped resources of these minerals in the Western United States. A full feasibility study by GBM Engineers LLC, who were responsible for overall project management and the process plant and infrastructure design, including OPEX and CAPEX calculated an After Tax NPV of US$249.8 million with a 25.8% After Tax IRR. Initial CAPEX was estimated at $108.3 million with a 3.7 year After Tax payback. Other engineering services were provided by HDR Engineering, Inc. (all environmental components; hydrology / hydrogeology; road design); Tetra Tech, Inc. (tailings storage facility design); Mine Development Associates (mine modelling; ore scheduling; mineral reserve estimation); and SRK Consulting (U.S.) Inc. (mineral resource estimation). Project has no impact on any wetlands, meaning no NEPA EIS process is required - only state of Idaho permits. In May 2017, the Idaho Department of Lands ("IDL") accepted our operation and reclamation plan. Together with a water rights permit from the Idaho Department of Water Resources, we are able to proceed with development and construction of the mine, subject to obtaining sufficient financing.